Customization: | Available |
---|---|
Tile Type: | Colored Steel |
Certification: | CE |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical parameters:
(1) Processing material: aluzinc/galvanized steel/colored steel coil
(2) Material thickness: 0.3-0.8mm
(3) Main motor power: 4 kw
(4) Pump power: 4kw
(5) Shaft diameter: 70mm and solid forming shaft
(6) Forming steps: 15 steps.
(7) Roller material: 45# forged steel, with hard chrome plating
(8) Main frame: 350H steel
(9) Medium plate thickness: 16mm
(10) Control systerm: PLC computer control with inverter
(11) Power supply: 380V, 3 Phase, 60Hz or as your requirement
(12) 0veral sized:about 5800mm*1200mm*1300mm
Company Introduction :
Our enterprise, Cangzhou Dixin Roll Forming Machine Co., Ltd, as the professional and leading manufacturer, can manufacture, design, installation and debug various roll forming machines and metal processing sheet equipments, which produce metal roof wall panel, glazed roof tile, CZ steel purlin, floor decking, roof ridge cap, sandwich panel, roof truss, shutter panel, shutter slat, door frame, guardrail, and metal sheet uncoiler, bending, slitting, cutting, flattening, punching, crimping.
Backed by reasonable design, precision machining and selected material, both our standard and customized machines are characterized by long life span, precise forming and easy operation. With our customers' trust, our machines have been sent to America, Australia, Russia, India, Sri Lanka, Nigeria, Pakistan, Uzbekistan, Mozambique, Angola, Turkey, Brazil, etc.
Warmly welcome to China to visit our factory and select the machines you need. Our address, Fuzhuang Industrial Development Zone, Botou City, Hebei Province, China
1) Payment: 30% T/T prepaid, and pay the balance before shipping.
2) Delivery time: 30 working days.
3) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
4) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
5) Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and CD to teach you to install and operate.
c. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 80 one man one day). To the seller's appointed account by T/T before the seller's technicians go to the buyer's factory. The buyer pays the seller's technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.