Customization: | Available |
---|---|
Tile Type: | Steel |
Certification: | CE, ISO |
Still deciding? Get samples of US$ 3/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. This Used Galvanized Steel Roller Shutter Doors Auto Roll Forming Machine For Sale uses galvanized steel sheet, colored armor plate or aluminum plate as the material plate. The products produced by this machine are bright in colored, against fading, resistant to rust, and be widely used in shops, working departments, warehouses, and fire partition. Its strength is three times higher than aluminum alloy door.
2.Machine technical parameters
Suitable Material | Material | GI, PPGI, PPGL |
Width | as drawing | |
Thickness | 1 mm | |
Material of rollers | High grade 45# forged steel, surface hard chromium plating | |
Rows of rollers | 12 stations | |
Material of shafts | High grade 45# forged steel | |
Diameter of shafts | 55 mm | |
Material of cutting blade | Cr12 Heat Treatment | |
Speed | 10-15 m/min | |
Side plate thickness | 16 mm | |
Chain size | 1 inch | |
Total power | 4 kw | |
Voltage | 380V 50HZ 3Phase | |
Appearance size (About) | 4500mm*800mm*1500mm | |
Weight(About) | 2 tons | |
Length measurement | Encoder | |
Control mode | PLC | |
Operating mode | Button + Touch screen |
3.Some machine pictures for your reference.
Production Process:
Uncoiling→ Feeding material into machine →Roll forming → Auto cutting →Products receiving
Packing Method
Main machine is packaged with plastic film
Transportation
All machines need one 40 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 45 days after receiving deposit.
Warranty
Two years, and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.(plane ticket, food, hotel and per day 80$ salary)
we also sales all kinds of color steel coils ,We have cooperated with the raw material factory for more than ten years to recommend to our customers. And 100% guaranteed quality and accurate length per ton.
Some FAQ:
Q1. What's your payment terms and delivery time?
A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable.
After we get down payment, we will arrange production. About 30-45 days for delivery.
Q2. Do you have after-sales support?
A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: We provide 12 months free warranty and free technical support for the whole life of any machine.
If the broken parts can't repair, we can send the new parts replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.
Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.
Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.