Tile Type: | Steel |
---|---|
Certification: | CE, ISO |
Condition: | New |
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Main parameters of ZT-900 roll forming machine | ||
1 | Suitable to process | Color steel plate, galvanized sheet, aluminum coils and etc. |
2 | Width of the feeding material | 1000mm |
3 | Sheet width | 900mm |
3 | Roller station | 14 rows |
4 | Thickness of feeding material | 1.0-2.0mm |
5 | Productivity | 8-12m/min |
6 | Rollers' material | 45# steel |
7 | Diameter of shaft | 90mm |
8 | Weight | About 8 T |
9 | Length | 10 Meters |
10 | Voltage | 380V 50HZ 3 phases |
11 | Wall thickness of main forming machine | 14mm steel plate |
12 | Main forming machine body | 400 mm H steel |
13 | Motor power | 15 kw |
Equipment and Qty. | |
Decoiler | 1 set |
Main roll forming machine | 1 set |
PLC control station | 1 set |
Hydraulic station | 1 set |
Post cut | 1 set |
Electric motor | 1 set |
Output table | 1 set |
1) Payment: 30% T/T prepaid, and pay the balance before shipping.
2) Delivery time: 30 working days.
3) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
4) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
5) Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and CD to teach you to install and operate.
c. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 80 one man one day). To the seller's appointed account by T/T before the seller's technicians go to the buyer's factory. The buyer pays the seller's technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
Suppliers with verified business licenses