Customization: | Available |
---|---|
Tile Type: | Colored Steel |
Certification: | ISO9001: 2000, Ce, SGS |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No. |
Name |
Unit |
Qty |
1 |
Main forming machine |
set |
1 |
2 |
PLC control system |
set |
1 |
3 |
Hydraulic pump station |
set |
1 |
4 |
Electric motor |
set |
1 |
6 |
5 ton Manual decoiler |
set |
1 |
7 |
Out put table |
set |
2 |
a. Need one 20 or 40 ft container, according to your final drawing.
b. The main body of machine is fixed to container by 8mm diameter steel wire, rollers and shaft is
covered with anti-rust oil.
c. Spare parts in carton box.
1.Q: How can I contact you?
A: You can talk to me anytime. Or send me enquiry email, I will reply you in 24 hours and offer the optimum solution to you.
2. Do you have after sales support?
A:Yes, we are happy to give advice and we also have skilled technicians available across the world.We need your machines running in order to keep your business running.
3.Q: How to visit our company?
A: 1.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
2.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
4.Q: How many years since you have been in this field?
A: Our company has been producing roll forming machines for almost 20years.We have rich experience for manufacturing and designing the machine.
5.Q. What can you do if the machine broken?
A:Our machine's warranty period is 12months, if the broken parts can't repair,we can send the new parts replace the broken parts freell,but you need pay the express cost yourself. if after warranty period,we can through negotiationfor to solve the problems,and we supply the technical support for the whole life of the equipment.
6.Q:How long the machine could be made?
A:Normally speaking, machine could be made within 30 working days. If you need machines in a hurry, we can make it for you less than a month.
7.Q:If our country's voltage is different from yours, how to solve that?
A:The usual voltage is 380v,220v,415v. If yours are not one of them, we will design the electric motor to suit your voltage.
2-storey corrugated metal roof rolling machine