Customization: | Available |
---|---|
After-sales Service: | Life |
Warranty: | 1 |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. The Product Description of metal glazed roof tile roll forming machine |
Suitable Material | HRB60 or equivalent |
Material Thickness | 0.2-0.8 mm |
Dimension | About 7.2*1.3*1.1m(L*W*H) , as per the drawing |
Length of the Sheet |
You can set the length according to your need. It is controlled by PLC which can ensure the accuracy of ±1mm. |
Cutting | Automatically stop and cutting when it comes to the set length. |
Roller Material | High grade 45# steel. Hard chrome plating, 0.05mm. |
Main Frame | 350# steel. More stable and no shaking. |
Middle Plate | 16mm. We use thicker plates to ensure stability of our products. |
Forming Steps | 11-16, according to the drawing. |
Shaft Material | Φ70 mm, high grade 45# steel. |
Treating process: tempering- finish turning, high rigidity, hard to deform. |
|
Cutting Blade Material |
Cr12, hardness HRC60-62. |
Treating process: heat treatment- plane abrasion- wire electrode cutting. |
Suitable Power | 380V, 50 Hz, 3 phase or according to your need. |
Screen | 7 inch touch screen, easy to operate. |
PLC | Delta DVP14ES |
Well-adapted to various conditions, such as moisture, electromagnetic disturbance. |
|
Frequency Converter | Delta VFD-M. It has the advantage of slowing down before cutting, to ensure the length accuracy (±1mm, far better than industrial standard ±3mm). |
Length Measurement Device |
Omron, made in Japan. |
It features with high accuracy and stability. |
6. Loading into container for Roll Forming Machine |
1) Payment: 30% T/T prepaid, and pay the balance before shipping.
2) Delivery time: 30 working days.
3) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
4) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
5) Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and CD to teach you to install and operate.
c. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 80 one man one day). To the seller's appointed account by T/T before the seller's technicians go to the buyer's factory. The buyer pays the seller's technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
shipping
:Nude,with waterproof cloth and stow-wood. Imported computer control system packed with waterproof cloth and card board.
2.Port:TIANJIN XINGANG PortLead .
3.Time: Shipped in 35 days after payment.