Customization: | Available |
---|---|
Type: | Rolling Machine |
Forging Forming Method: | Mold Forging |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
2.Equipment detailed parameters:
1.Processing material |
aluzinc/galvanized steel/colored steel coil |
2.Material thickness |
Max2mm |
3.Feeding width: |
1200mm |
4.Effective width |
1000mm As design |
5.Main motor power |
30kw |
6.Pump station power |
7.5kw |
7. Shaft diameter |
100mm solid shaft ,Surface of roller coated with chrome 0.05mm thickness |
8.Forming steps |
20 steps |
9.Main frame |
400H Steel frame |
10. Side plate thickness |
20mm |
11.Roller material |
45 # forged material, high frequency quenching, hard chromium plating |
12.Control systerm |
Panasonic PLC control with touch screen,Mitsubishi frequency converter ,Encoder(Omron) |
13.Cutting blade material |
Cr12 |
14.Working speed |
About 15-20m/min |
15. Transmission way |
1.5 inch double chain |
16. Machine size (mm) |
About 11.8m*1.6m*1.6m |
17.Power supply |
380v,3phase,50hz or accodring to customer request |
18 Electric Pre- cutter |
Add a motor with chain drive |
3.Main Components:
No |
Name |
Qty |
1 |
Main Rolling Machine |
1set |
2 |
10ton electric decoiler |
4 set |
3 |
Hydraulic Cutting |
1set |
4 |
PLC control system |
1set |
5 |
Electric motor 7.5kw*2 |
2set |
6 |
Hydraulic Pump Station |
1set |
7 |
Output table |
2sets |
8 |
Spare parts |
1 box |
Direct customers to our company personally test our equipment;
Our engineers accompanied the test machine until customer satisfaction;
Our engineers free of charge for customer training guide customers to operate and maintain equipment;
Customers can ask engineers to client countries for machine installation and commissioning, clients pay the flight cost and the cost of our engineer.
Q1. What's your payment terms and delivery time?
A1: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable.
After we get down payment, we will arrange production. About 30-45 days for delivery.
Q2. Do you have after-sales support?
A2: Yes, we are happy to provide advice and we also have skilled technicians available across the world.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers specifications, using top brand components.
Q4. What will you do if the machine is broken?
A4: We provide 12 months free warranty and free technical support for the whole life of any machine.
If the broken parts can't repair, we can send the new parts replace the broken parts freely, but you need pay the express cost by yourself. If it is beyond the warranty period, we can negotiate to solve the problem, and we supply the technical support for the whole life of the equipment.
Q5. Can you be responsible for transport?
A5: Yes, please tell me the destination port or address. we have rich experience in transporting.
Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.