China supplier Rain Gutter Color Steel Cold Roll Forming Machine
The advantages of the double deck roll forming machine
1. High efficiency
2. Lower cost
3. Long life time: 30years
4. Low energy consumption
5. PLC computer control
6. No noise, no shake
1. Technique parameters
Technical parameters |
Name |
box gutter and half round gutter roll forming machine |
Roller steps |
15 |
Dimension |
5800*1200*1500 |
Weight |
About 4.5 T |
Forming thickness |
0.5-0.9mm |
Large frame |
350mm H-Beam |
Diameter of roller |
Φ50mm |
Rolling material |
Steel 45# |
Voltage |
380V 50HZ 3 phases or customized |
power |
5.5kw |
Cutting system |
Hydraulic cutting(avoiding noise and smooth cut) |
Material of cutting |
Cr12 |
Control system |
PLC brand :Panasonic |
Production capacity |
8-12m/min |
Warranty |
1 year and we provide technical support for whole life, and overseas service |
Maintain |
Easily :Timely adding oil |
Payment terms |
30% in advance, the balance before delivery |
Package |
Standard package |
Delivery |
40 days after receiving the deposit |
2. Work flow
3. Specific description
(1) Manual decoiler
Un-powered, single head, max capacity: 5000kg
(2) hydraulic pump station
It is controlled by gear wheel oil pump, after filling the hydraulic oil into the hydraulic oil tank, the pump drive the cutting machine to begin the cutting job.
(3) Computer control cabinet
It adopts TaiDa PLC to control, the target sheet length is adjustable.
Computed mode has two modes: Automatic and manual.
Touch screen.
(4) Output table
It is used to load the finished sheet. This kind is convenient for shipment.
(5) Spare parts
4. Payment term
TT, you should pay 30% as the deposit on the order day, then pay 70% before delivery when you inspect goods well in factory or by video
5. Warranty
24 months, and lifelong technical support service
6. Installation
If you need, we will send one technician to your factory to install & testing the machine. You should assist the technician to get Visa and pay for flight tickets and local accommodation, and pay 80 USD/day for salary.
7. Packaging&Shipping
1.Packaging Details:Nude,with waterproof cloth and stow-wood. Imported computer control system packed with waterproof cloth and card board.
2.Port:TIANJIN XINGANG PortLead .
3.Time: Shipped in 35 days after payment.
Usually the welding pipe cold roll forming machine can be packed into one 20' feet container or 40' feet container. We have good relationship with the shipping agent. Either you can find the shipping line at your side or we can help you.
If u have any interest,please contact me any time