Customization: | Available |
---|---|
Tile Type: | Colored Steel |
Certification: | CE, ISO |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Automatic Color Steel Metal Roof Single Ridge Cap Tile Cold Roll Forming Machine
Product DescriptionWe can produce too many types roofing panels roll forming machine ,especially according to your request to produce.you need provide panel drawing,feeding width,effective width,and materials thickness,then we can send you more machine details.please feel free contact me.
Machine parameters
1 | Suitable material | color steel sheet, galvanized steel sheet, aluminium sheet |
2 | Material width | 600 mm or as your required |
3 | Material thickness | 0.3-0.8 or as your required |
4 | Working speed | 8-12m/min, can be 20-25m/min |
5 | Main motor power | 5.5kw with cycloidal with reducer |
6 | Hydraulic pump power | 4kw |
7 | Electrical control system | PLC control system with inverter |
8 | Shaft diameter | 75mm |
9 | Roller station | 15 rows, depend on your panel profile drawing |
10 | Roller | high grade 45# steel, hard chrome plating |
11 | Working time | 24 hours |
12 | workers | 1-2 only |
13 | Cutting head material | Cr 12 mould steel with quenched treatment |
14 | Voltage | 380V 3Phase 50Hz or as your required |
15 | Weight | 2.5T |
16 | The machine size | 6500mm*1500mm*800mm |
1. Main body of roll forming machine and decoiler is nude packing.
2. Rollers, shafts, PLC, pump and cutter are packed with water-proof plastic film, spare parts in carton box.
3. One set of machine needs a 20'container to shipping.
1.Warranty
One year and half an year,and we will provide technical support for wholelife of the equipment.
2.Installation And Charge
Purchaser pays all charges during period of install to overseas,
(include charges of food,lodging and round trip air tickets ,etc.)
Moreover,pay subsidy 60USD/day until Installation finished.
If problems happened out of warranty and need debugging overseas
Customer should pay for all the charges (including food,lodging and round trip air tickets etc.)
Moreover pay 100USD/day till install finished
1) Payment: 30% T/T prepaid, and pay the balance before shipping.
2) Delivery time: 30 working days.
3) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
4) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
5) Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and CD to teach you to install and operate.
c. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 80 one man one day). To the seller's appointed account by T/T before the seller's technicians go to the buyer's factory. The buyer pays the seller's technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.