Customization: | Available |
---|---|
Tile Type: | Colored Steel |
Certification: | CE, ISO |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cost-effective Trapezoidal Sheet Roll Forming Machine With Excellent Quality
Product Description
1 |
Suitable Material |
Colored Steel plate, Galvanized Board,Aluminum Plate |
2 |
Width of the raw material |
1000mm |
3 |
Rows of rollers |
13 rows |
4 |
Appearance size |
6000*1350*1300mm |
5 |
Total power |
Main motor power -4kw Hydraulic station power-4kw |
6 |
Thickness of raw material |
0.3-0.8mm |
7 |
Productivity |
10-15m/min |
8 |
Diameter of shaft |
75mm |
9 |
Voltage |
380V/220V , 60Hz 3phases |
10 |
Chain |
1 inch outside |
11 |
Wall plate thickness |
16mm |
Packaging & Shipping
1. Delivery: in stock
2. Package: Export Standard package for container
3. Payment: TT(30% by TT in advance, 70% by TT after you inspect the machine )
4. Validity: good for 20days
Installation (optional by the buyer)
a.After the machine arrives at the destination, the seller will send technician to the buyer's factory to install the machine if the buyer wants. The buyer needs provide some technicians to assist the installation work.
b.Installation period(The buyer should have been prepared for the steel sheet, foundation position the machine before seller's technicians departure): 5 days
c.The buyer pays the installation charges to the seller's appointed account before the technician departure: USD1,000 per set.
d.Training period: 2 days. (we can supply training on the operation spot if buyer needs)
e.The buyer pays the seller's technician: Travel cost outside China (including round flight charges), accommodation and foods (at least three-star hotel with air condition), solve the language problem, provide transportation from living place to the work place, and insurance out of China, etc.
f.With in 3 months after arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. Inspection standard is based on the technical standard signed by both parties and our company standard.
Established in 1996, our factory gets specialized in producing all kinds of roll forming machines such as Corrugated Sheet Roll Forming Machine, IBR Sheets Roll Forming Machine, Glazed Tile Roll Forming Machine, Double Layer Roll Forming Machine, Three Layer Roll Forming Machine, Sandwich Panel Roll Forming Machine, C/Z/U Purline Roll Forming Machine, etc. There are professional engineers and workers to design and produce according to your need. Located in Nancang Street, Botou city where there are lots of roll forming machine factories, we firmly hold the belief that only good quality and satisfactory after-sale service can make our factory stand out. There are professional engineers ready going abroad to provide installing, debugging service and technical guide. We try to do better in this field. The machines produced by our factory have been sold worldwide such as Russia , Kazakhstan, England, America, Italy, Australia, Philippines, India, Thailand, Nigeria and Syria, etc. So we are fimiliar with the different needs for different markets. Sincerely hope to cooperate with you.
Terms of payment
1) Payment: 30% T/T prepaid, and pay the balance before shipping.
2) Delivery time: 30 working days.
3) Guarantee period: 12 months limited warranty starting from date of delivery. Shipping cost for parts to be replaced during warranty period have to be borne by the customer.
4) Spare parts: bearings, buttons, chains, magnetic valve, protective tube etc.
5) Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.
b.Without visiting, we will send you user manual and CD to teach you to install and operate.
c. COST OF INSTALLATION:
The buyer should pay the installation charges (USD 80 one man one day). To the seller's appointed account by T/T before the seller's technicians go to the buyer's factory. The buyer pays the seller's technicians travel cost outside China, including round air tickets fee, accommodation and food, provide transportation from living hotel to the work place, necessary communication, and insurance, etc.
Contact me
Any interested in our products ,please feel free to contact me !