After-sales Service: | 1 |
---|---|
Warranty: | 1 |
Automatic Grade: | Automatic |
Power Source: | Electric |
Screw Design: | Double-Screw |
Certification: | CE, ISO, ISO 9001:2008, CE, SGS |
Customization: |
---|
Suppliers with verified business licenses
1 | Decoiler | 4 |
2 | Forming machine | 1 |
3 | PLC computer system | 1 |
4 | Pump station | 1 |
5 | Electric motor | 4 |
6 | Cutting head | 1 |
30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable. After we get down payment, we will arrange production. About 30-45 days for delivery.
1.Tighten to container with steel wire rope and welded angel iron.
2.Main forming machine and unciler is naked (if you need we can also packed with water-proof plastic)
3 .Roll forming machine PLC control system and moter pump are packed with water-proof plastic coveragePortTianjinLead Time :30 days after your pre-deposit
1: How to place order
Inquiry---confirm the profile drawings and price----confirm the PI---arrange the deposit or L/C---then OK
2: How to visit our company
Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),
then we can pick up you.
Fly to Tianjin Airport: By high speed train From Tianjin to Cangzhou Xi(0.5 hours),
then we can pick up you.
If any questions, you can call me mobile phone at any times:
3: If you want to get more pictures or videos of the machines, I can send them to you by Email or SKype
Suppliers with verified business licenses