Ridge cap cold roll forming machine production line
1. Components:
1. Decoiler
2. Coil sheet guiding and adjusting equipment
3. Film covered device(optional)
4. Main roll forming system
5. Hydraulic pump station
6. PLC control system
7. Cutting device
8. Run-out table
2. Work flow:
Decoiling the sheet----sheet guilding----film covering(option)----roll forming----PLC controlling----hydraulic cutting----receiving the finished panel
3. Technical Parameters:
No. |
Main parameter for |
1 |
Suitable to process |
Galvanized/Aluminum/Color steel sheet |
2 |
Width of plate |
1250mm |
3 |
Thickness of plate |
0.3-0.8mm |
4 |
Rollers |
High grade 45# steel, with hard chrome plating |
5 |
Forming steps |
16 |
6 |
Sprocket chain |
1.5 inch |
7 |
Pump station power |
4kw |
8 |
Shaft |
75mm, high grade 45# steel, heat treatment |
9 |
Hydraulic oil pump |
CB-E310 |
10 |
Weight |
About 2.5 tons |
11 |
Productivity |
8-12m/min |
12 |
Cutting head |
Cr12 mould steel with quenched treatment |
13 |
Control system |
TAIDA brand PLC control |
14 |
Voltage |
380V 3Phase 60Hz |
15 |
Motor power |
4kw |
16 |
Dimension |
About 6.8m*1.5m*1.5m |
17 |
Hydraulic pressure |
10-12mpa |
18 |
Index error of length |
±1mm |
19 |
The temperature range of working line |
-35-50° |
Above all the parameters can be changed exactly according to customer's requirements.
4. Advantage of DIXIN roll forming machine
No. |
DIXIN roll forming machine |
1 |
High grade quality |
2 |
Reasonable price |
3 |
High efficiency |
4 |
Low failure rate |
5 |
Low energy consumption |
6 |
Free after-sale service |
7 |
Reliable working |
8 |
Durable |
9 |
Wide application |
10 |
Beautiful appearance |
11 |
Welcomed by all over the world customers |
12 |
Professional foreign trade team |
13 |
Mature technician team |
14 |
Customize special type |
FQA
1. what is your guarantee period?
Guaranteed against malfunctions due to manufacturing defects for 12 months from the date of loading.
machine in my factory?
2.How to visit our company:
A.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour),then we can pick up you.
B.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours),then we can pick up you.
If u have any interest,please contact me any time